6 Man Welfare Unit Hire

The 6 Man Planet Power Mobile Eco Welfare Unit with Rest Area

Up to 75% cheaper to run than generator-operated units and fully HSE-compliant, our portable 6 man welfare unit for hire offers remote workers and companies a comfortable, practical, and eco-friendly off the grid solution.

This 6 man welfare unit is equipped with a spacious rest area, toilet facilities, and a generator/drying room for improved employee comfort and satisfaction. Perfect for use on remote projects, construction sites, or as a temporary office space.

Enquire today for delivery!

Dimensions

  • Width 2300mm
  • Length 3655 mm
  • Length (including drawbar) 4920 mm
  • Height (on wheels) 2900 mm
  • Height (on ground) 2500 mm
4-6 People
HSE Compliant
HVO Compatible
Solar Hybrid
Easy to Site

WHAT’S INCLUDED?

  • Bench seating for 4 to 6 people
  • Fixed table
  • Toilet facilities with a separate entrance
  • Drying/generator room
  • Kitchen facilities in the rest area
  • Auxiliary battery-powered heating
  • Solar charged interior lights
  • Solar powered phone charging points
  • Notice/wipe board
  • GRP interiors
  • Carbon monoxide and smoke alarms

Read on to learn about this 6 man welfare unit in more detail.

get a free quote

Fill out the form below with as much detail as you can. This will help our expert team get back to you with the most relevant information in the quickest time.

If you would like a quote or more information please contact us and one of our team will get back to you as soon as possible.

6 man welfare unit in car park

6 MAN WELFARE UNIT: KEY FEATURES

For power and efficiency:

  • Up to 75% cheaper to run than generator-powered units with solar charged batteries and hybrid technology
  • Generator auto-shut-off system to reduce unnecessary fuel use
  • Easy changeover to external plug-in mains power if available
  • Internally controlled isolation switch for hydraulic raise/lower function and quick siting

For safety and security:

  • Sliding windows with internal locking steel shutters
  • Lockable towing gear security shroud with anti tamper design
  • Anti-vandal keyholes to prevent theft and unauthorised entry
  • Anti-vandal, anti-tamper doors with a 3-bolt locking system
  • Emergency external lock release mechanism
  • Mechanical door stays with friction control
  • Frame mounted electrical compliance and safety records
  • Carbon monoxide and smoke alarms

For hygiene and maintenance:

  • High-gloss, wipe-clean, white GRP interior panels
  • Soluble paper towel system – prevent blockages and reduce waste
  • 28 gallon holding tank for reduced toilet servicing
  • Two hot/cold wash full forearm sinks within the unit

For compliance and quality assurance:

  • Fully HSE-compliant and road legal
  • All electrical installations meet BS 7671 18th Edition standards
  • Kerb-height door design for easy roadside access
  • Screw-in lifting eyes available on request for safe off-loading
  • VCA Type Approval under Directive 2007/46/EC – a safe, towable welfare unit that complies with official UK regulations

Get in touch with us today for your Welfare Unit hire on 01942 316900.

THE REST AREA

  • Wrap-around bench seating for 4 to 6 people around a fixed table: Space efficient and comfortable seating for rest, meals, and social time.
  • Kitchen equipment: Generator-powered kettle and microwave for preparing hot food and drinks on remote sites.
  • Auxiliary battery-powered heaters: Warmth without relying on generators – an eco-friendly heating alternative.
  • Full-forearm sink with generator-powered hot/cold water: No hygiene dispensers are available in the rest area, encouraging workers to wash their hands in the designated toilet area.
  • Solar-powered interior lights: Reliable, eco powered lighting to reduce running costs.
  • Solar-powered phone charging point: Stay connected even when working off-grid.
  • Sliding window with internal locking shutters: Provides natural light and airflow while maintaining security.
  • Carbon monoxide alarm: Offers early warning in the case of fumes or gas build-up.
  • Frame-mounted compliance and service records: For your employees’ peace of mind.
  • Small wall mounted wipe/notice board: Update your team with schedules, updates, and health and safety information.
  • GRP wipe clean interior panels: Low maintenance, easy to clean panels for your convenience.
6 man welfare unit

THE DRYING AND GENERATOR ROOM

  • Drying shelf with glove/boot rack: A dedicated and effective drying space for wet gear and PPE.
  • Generator-powered wall mounted heater: For fast and reliable heat supply to assist with drying.
  • Diesel/battery powered heater outlet: To save on fuel and dry clothes or PPE without running the generator.
  • Coat hooks: Keep PPE and coats off the ground and protected.
  • Wall mounted smoke alarm: Alert employees when fire or electrical hazards arise.
  • Low level external fuel fill point: Safe and convenient fuelling access with a visible gauge.

TOILET CUBICLE:

  • Dedicated external entrance: Improve hygiene practices with a separate, external toilet entrance.
  • Full-forearm sink with hot-wash and cold-wash options: Foot-pedal operated cold wash to minimise contact and hot wash options for hygiene compliance.
  • Motion sensor light: Save energy and improve both safety and convenience in low-light, remote conditions.
  • Wall mounted toilet essentials: Reduce toilet maintenance with soap, jumbo toilet roll, and paper towel dispensers in large quantities.
  • 28 gallon holding tank: Reduce the need for frequent welfare unit toilet servicing.
  • Soluble towel system: A safer, greener option where your paper towels dissolve in water to prevent blockages.
6 man welfare unit

ADDITIONAL DETAILS

The Planet Power 6 portable welfare unit fir hire is designed for a quick, stress free setup with its familiar hydraulic raise and lower operation. Site on any terrain with confidence.

Enjoy safe and controlled unit height adjustments with the internally operated isolation switch, and accessible roadside parking placement with doors designed to open above standard UK kerb height.

ENQUIRE TODAY: 6 MAN WELFARE UNIT FOR HIRE

Whether you’re based in Wigan, Liverpool or Manchester, we provide Welfare Units to hire across the North West. If you need a compact, lightweight groundhog mobile welfare unit for hire, fill in our enquiry form today. Or, contact us directly on 01942 316 900.

Trust in Welfare Unit Hire Ltd. to give you a safe and comfortable space to work – no matter where you are.

Need something bigger?